The Most Challenging Projects. The Best Solutions.

Explore selected projects across wind turbine services, rope access, offshore operations, rigging, and heavy lift. We showcase the scope of our work while respecting the confidentiality requirements of our clients and partners.

View from a wind turbine nacelle of a lattice crane and an installation vessel on the open sea
Lifting, Offshore, WindThe Netherlands, North Sea

Major Component Replacement

RAO supported the replacement of five generators and one wind turbine blade at an offshore wind farm, carried out for DWT. We provided experienced riggers to join the team working in the upper section of the turbine. Our specialists were directly involved in component replacement, equipment preparation and positioning, lifting operations, as well as the loading and organisation of equipment on board the vessel.View case study
Illustration: an industrial hall with an overhead crane lifting a large steel component
LiftingLinz, Austria

Commissioning of Overhead Cranes for an EAF Furnace

RAO supported the Felbermayr Deutschland GmbH team during the commissioning of two overhead cranes for the new EAF at the Greentec Steel facility in Linz. Our team assembled the lifting structure, prepared the rigging equipment, positioned components, and dismantled the equipment upon completion of the work. The operation involved a scrap charging crane with a rated lifting capacity of 450 t, load-tested at 565 t during the official AMVO inspection, and a molten metal handling crane with a lifting capacity of 265 t.View case study
Construction site with wind turbine blades in blue covers, two cranes and turbines in the background
Lifting, Offshore, WindMartinique, Caribbean

Wind Turbine Blade Transport

RAO built an auxiliary structure for NMT to support the transport of wind turbine blades in Martinique. Part of the structure was assembled onshore, lowered into the sea, and completed in the water. Our team supported the lifting operation and coordinated activities with the other crews involved. Once the blades had been transported, RAO recovered and dismantled the structure. The work was carried out under the technical supervision of Saetech B.V.View case study
Technician on a helideck at sunset against a dramatic sky
OffshoreEU · Malaysia · Angola · USA

Helideck – Project Overview

For around 10 years, we have worked with Finnish manufacturer Frictape Net on helideck projects worldwide. We coordinate logistics, mobilise specialist teams, remove worn safety nets, install new systems, and carry out the required lighting works and surface testing. Our work supports helideck safety and helps prepare each installation for its next certification period. Once the work is complete, the team demobilises from the site.View case study
Two technicians on ropes next to large white pipes of an installation above the sea
OffshoreCameroon

Offshore · System Deluge

For over a year, RAO supported Siron with work on the Deluge system aboard the Hilli Episeyo, operating offshore near Kribi, Cameroon. The team supervised rope access operations and carried out work on the piping system, including dismantling, high-pressure internal cleaning, reassembly, and Dry Deluge testing. The work was performed under daily Permits to Work in an offshore environment, including hazardous areas with potentially explosive atmospheres.View case study
Several technicians on ropes under a steel structure

Offshore · Pre-piling Template

RAO supported the installation of a pre-piling template beneath the Apollo jack-up vessel. Marcin worked as a rope access rigger and day shift supervisor, while also coordinating the ALE and Conbit teams on site. The scope included accessing the area beneath the vessel, attaching rigging lines, and supporting the installation of the template beneath the hull. Barge loading, transport, and the overall installation package were within ALE’s scope.View case study
Wind turbine blade seen from the nacelle roof, farmland below
WindPoland

Offshore · Blade Inspection

RAO carried out blade inspections on 24 Vestas V80 wind turbines at the Zajączkowo Wind Farm. The work was performed using rope access techniques and also included testing the functionality of the Lightning Protection System (LPS). Following the inspections, the client received detailed reports outlining the findings and repair priorities.View case study
Safety Day participants in high-visibility vests and helmets in front of wind turbines
HSEQPoland

Safety Day

For DWT Polska and ENGIE, RAO organised a Safety Day featuring a practical wind turbine nacelle evacuation exercise. More than a dozen participants practised evacuating from a height of approximately 100 metres under the supervision of the RAO team. The exercise was carried out safely and combined with a briefing on HSE, evacuation procedures, and safe working practices on wind turbines.View case study
Work platform suspended next to a wind turbine tower
WindPoland

Blade Tip Repair

Following a lightning strike, approximately five metres of the tip section of a Vestas wind turbine blade became detached. The DWT and RAO teams reconstructed the blade structure, progressively joining both sides of the damaged section. RAO proposed lifting the original tip component using a winch to reduce loading on the work platform and avoid lowering the entire blade to the ground. Following the repair, the Lightning Protection System (LPS) was tested and the turbine was returned to operation.View case study
Service platform at a wind turbine blade against green fields
WindPoland

Repair

RAO repaired a major structural crack in a wind turbine blade, carrying out the initial work from inside the blade before reconstructing the structure and outer shell from the outside. Repair and lamination work was performed from a service platform. Final finishing works were completed using rope access, reducing platform usage time and overall project costs.View case study
Partners

We work with leading companies in the heavy lift, marine logistics, and wind energy sectors in Poland and worldwide.

IAS
Meissner Sicherheitstechnik
RAW Wear
Rope Access Team
SWAT Safety Work and Training
Timber
Questions?

Contact Us

We’ll get back to you within 24 hours.

RAO Sp. z o.o.ul. Niepodległości 32
62-040 Puszczykowo
Gallery

A Closer Look at Our Work

Project highlights from our onshore and offshore operations — rope access, inspections, repairs, and rigging.